Asker Anónimo Asks:
Buenos días, Soy un arquitecto superior español (especialidad construcción-título año 1988) y 27 años de experiencia en proyectos y obras de edificación. En una oferta d trabajo en Lima requieren titulación de ingeniero civil. ¿Es posible la convalidación?
ingenieriacivilperu ingenieriacivilperu Said:

para presentarte para una oferta de trabajo es nesesario el titulo de ingeniero civil pero por lo q se no es necesario la conmvalidacion

tettura:

A bridge over a stream near Hale, Vermont, USA.

The shape of this corrugated metal arch is not a section of a cylinder. It’s closer to a parabola, which is a more efficient shape for carrying uniform vertical loads. Because the height (and therefore, weight) of the rubble fill varies above the arch, the shape is probably not actually a parabola, but something slightly better adapted to this load distribution. 

Was this built by the Army Corps of Engineers?

teddymz:

Everything I know shuttered …. .. working smart though #smart #construction #work

derivesur:

“We’re going to have going-away party for you on Thursday, Alex,” Rafael told me. Rafael is the engineer for the construction project I worked on in San Cristóbal de las Casas, although really he’s a good friend more than anything. “We’re going to grill meat, like we do further north in Mexico.”

So on the appointed day, I showed up at quitting time for the barbecue. The other workers were wrapping things up for the day. Rafael wasn’t there.

He did show up, though, a half an hour later, with two bags of raw meat, tortillas, and a bunch of jalapeños.

Now, there’s no kitchen or anything at the site. Nor is there a grill. And I guess I was expecting him to show up with some sort of charcoal grill like people use on the street here. Nope.

“Ok, somebody go get the charcoal, and the rest of us will set up the grill.”

And that’s how I learned how to make a grill out of construction materials.

If you can’t tell by the photos, they placed brick roof tiles on top of criss-crossed rebar (a structure used to anchor vertical concrete beams), upon which we burned the charcoal. Another rebar structure was tied on top of that with wire, and a wire mesh used for sifting sand was placed on top of that, which is what supported the meat and chilies.

Delicious.

I had a great six weeks working with these guys, and I’ll miss them. Later on I’ll be working on some interviews I did with the workers, to publish on my blog.

Imagen filtrada del nuevo aeropuerto para Corea del Norte

#ingenieria Diseño de Estación de Tratamiento de Agua Potable compacta (por eoimedia)

Saludos , se que a veces programar en la calcu es muy tedioso ,por lo que Roger Broncano asiduo desarrollador,creo un software para programar, el tan popular “HPUSERedit” , se que la mayoria lo conoce ,pero aun tenemos a los nuevos usuarios que no lo conocen ,pero aqui esta ,es la version 5.4 ,aunque tambien esta la version 6 ,pero la 5.4 es mucho mas estable 

DOWNLOAD




#ingenieriacivil
Diseño de Tanque cilíndrico de concreto, fundación
HOJA EXEL

#ingenieriacivil

Diseño de Tanque cilíndrico de concreto, fundación

HOJA EXEL

El #Perú será sede de uno de los eventos académicos más importantes que organiza la comunidad científica mundial. Del 01 al 04 de julio, se llevará a cabo en la ciudad de Huaraz, el “Foro Internacional Glaciares: Retos de la Investigación al servicio de la sociedad en el marco del cambio climático”. Este evento es organizado por la Autoridad Nacional del Agua (ANA) en coordinación con instituciones públicas y privadas y, se espera la llegada de reconocidos investigadores, profesionales y estudiantes de diversas partes del planeta.

 